

Transform Your Business with Data Center Modernization
Agile Data Infrastructure: Increase business agility with cloud sensitivity and an integrated flexible infrastructure.
Modern Data Protection: Protect customer experiences by adhering to continuous availability and compatibility requirements.
Intelligent Operations: Increase operational efficiency by predicting and automatically revising processes and systems across the data center.
WHY DATA CENTER MODERNIZATION?

Agile Data Infrastructure
A flexible and agile infrastructure is needed for your data center to respond quickly to current needs.

Modern Protection
Modern data protection is essential to keep your organization in service at all times, to respond to new regulations, requirements and to protect against threats.

Smart Proccess
With software solutions that can predict and respond automatically, it is at the forefront to fulfill service levels and reduce the operational overhead.
WHAT WE DO?
Your institution’s data center; Let us analyze in detail in terms of both infrastructure architecture and operation and prepare you a comprehensive report with determinations compatible with world standards.
With this service, we aim to observe the data center infrastructure from top to end;
- Building selection; analysis (fire, water, lightning, etc.), authorization despite disasters,
- Data center design; interior design, air conditioning, alarm systems, ups, generator, fire prevention systems, disaster situation center
- Let’s give details on the application of electrical and data cabling standards.

DATA CENTER MIGRATION
We move data center to a different location without interrupting any service. First, we conduct a detailed analysis and evaluate the transportation in all its dimensions. In the light of the analysis, we carry out the transportation step by step. Let’s visit you for more detailed information.
STEPS FOR A SUCCESSFUL MIGRATION

Initiation
We create the data center migration project through mutual negotiations. We establish our transport team with the necessary knowledge and experience according to the needs of the institution and complete our preparations.

Risk assesment
Göçün başarılı olması az harekete bağlıdır. Bu kapsamda göç başlamadan adımlarımızı olabildiğince sadeleştirip uygulamalar ve BT ekipmanları arasındaki bağımlılıkları ayrıntılı bir şekilde değerlendiriyoruz.

Planning
Bu aşamada ayrıntılı planlarımızı ortaya koyuyoruz, büyük işleri küçük parçalara bölüp, her ihtimali bir adım her adımı ayrıntılarıyla planlıyoruz. Olası acil durum planlarını belirleyip ön testleri yapıyoruz.

Implementation
At this stage, the migration process is implemented. We re-apply the tests performed before migration at the end of migration. After completing the tests, we proceed to the monitoring process

Monitoring
We monitor the possible disruptions that may occur after the migration and make the quick intervention easier by allocating extra resources.

Closing
We successfully complete the final inspections and close the project with all stakeholders. The successful completion of the contracts and the project is evaluated and approved, and the process is completed.
DATA CENTER MODERNIZATION AND DATA CENTER MIGRATION
As IT / IBS, let's visit you for more detailed information and on-site analysis.